#122Col: In Progress⬆️ MediumAuthor: ThomasLast modified: 2026-07-04 05:03:14
Tags:
none
Description
Comments
👤 ThomasCreated 2026-05-26T07:56:42.723391
This will be on the north side of the tanks, it'll be a bessa block tank house on top of a concrete slab.
The pump house will have a double powerpoint for powering the house pump and the sump pump.
The pump house will also have a pressure tank for smoothing the pressure drops.
The tanks will be on their manifold which then connects to the pump over 25mm blue line, then the pump will connect to the pressure tank, before heading to the house again as 25mm blueline.
the blueline will be burried ~40cm below ground for the house supply. with power coming through a different trench (about 50-60cm deep).
No comments yet
Activity
Moved from Soon to In Progress
2026-06-28T22:14:43.736929 · Thomas
Moved from In Progress to Soon
2026-05-30T07:53:17.987125 · Thomas
Comment added
2026-05-26T07:56:42.723414 · Thomas
Moved from Soon to In Progress
2026-03-10T07:48:25.149928 · Thomas
Moved from In Progress to Soon
2026-02-08T09:11:00.227611 · Thomas