Concrete the Tank Pump Pad

Done ⬆️ Medium Author: Thomas Last modified: 2026-09-19 01:28:28
Tags None

Description

Comments

  • 👤 Thomas Created 2026-09-12T21:11:13.319Z
    1700 × 1300
  • 👤 Thomas Created 2026-07-28T10:00:29.508Z
    Road base and that’s should be all
  • 👤 Thomas Created 2026-07-28T06:55:17.837Z Updated 2026-07-28T06:56:22.501937
    pad size change to be 1600x1200
    that's usable area of 1200 x 1000

    at 70mm thick, this is 16 bags of concrete.

    to block the out side would take 10 blocks per layer at 4 layers ~44 blocks if i use the half width.

    So the only changes from before are the number of blocks, and the size of blocks. and 1x 6m 30x75 for the frame.
  • 👤 Thomas Created 2026-07-26T07:24:49.256Z Updated 2026-07-26T07:34:25.256555
    1400x1200 x 100mm thick - about 15 bags
    7x 190x190x390 besser blocks per layer.
    28 besser blocks total.

    4 bags of standard mortar
    trowel
    50mm pipe + 4x 45s
    5 bags of concrete to fill corners
    roadbase to go underneath
  • 👤 Thomas Created 2026-07-26T06:20:39.845Z Updated 2026-07-26T06:23:13.831176
    going to have a few pieces of pipe going through the concrete, for mains power, in water, out water. Maybe one for the sump power?
No comments yet